Saat noutopistetoimituksen veloituksetta*, kun tilauksesi arvo ylittää 39 €!
*Koskee yksityisasiakkaiden tilauksia, jotka toimitetaan Suomeen.
|
|

avaa valikko

Construction Scheduling, Cost Optimization and Management
93,80 €
Taylor & Francis Ltd
Sivumäärä: 338 sivua
Asu: Pehmeäkantinen kirja
Julkaisuvuosi: 2019, 12.12.2019 (lisätietoa)
Kieli: Englanti
Construction Scheduling, Cost Optimization and Management presents a general mathematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modelled. This book presents an entirely new approach to the construction scheduling problem. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization, including construction engineers, highway engineers, transportation engineers, contractors and architects. It will also be useful for researchers, and graduates on courses in construction scheduling and planning.

LISÄÄ OSTOSKORIIN
Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
Tilaustuote

Tilaustuote

Tämän tuotteen tilaamme kustantajalta tai tukkurilta varastoomme. Saatavuusarvio on tuotekohtainen. Lähetämme toimitusvahvistuksen heti, kun tuote on toimitettu varastoltamme rahdinkuljettajalle.

Arvioimme, että tuote lähetetään meiltä noin 1-3 viikossa.
Construction Scheduling, Cost Optimization and ManagementSuurenna kuva
Näytä kaikki tuotetiedot
ISBN:
9780367863807
Kansikuva tuotteelle