SULJE VALIKKO

avaa valikko

Construction Scheduling, Cost Optimization and Management
248,90 €
Taylor & Francis Ltd
Sivumäärä: 338 sivua
Asu: Kovakantinen kirja
Julkaisuvuosi: 2001, 25.01.2001 (lisätietoa)
Kieli: Englanti
Construction Scheduling, Cost Optimization and Management presents a general mathematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modelled. This book presents an entirely new approach to the construction scheduling problem. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization, including construction engineers, highway engineers, transportation engineers, contractors and architects. It will also be useful for researchers, and graduates on courses in construction scheduling and planning.

Tuotetta lisätty
ostoskoriin kpl
Siirry koriin
LISÄÄ OSTOSKORIIN
Tilaustuote
Arvioimme, että tuote lähetetään meiltä noin 1-3 viikossa.
Construction Scheduling, Cost Optimization and Managementzoom
Näytä kaikki tuotetiedot
ISBN:
9780415244176


Toimitusehdot


Asiakaspalvelu


YHTEYSTIEDOT


SEURAA MEITÄ
Avainlippu

Booky.fi | Kotimainen kirjakauppasi netissä

Löydä seuraava lukuelämyksesi meiltä. Valikoimassamme ovat kaikki kotimaiset kirjat sekä noin 25 miljoonaa ulkomaista teosta.
Toimitamme tilaukset maailmanlaajuisesti!

Tietosuojaseloste

Ladataan sisältöä...